About CJ Callan
Over 40 years in Construction
Our History
We have earned a reputation for delivering cost effective solutions
Originally founded in 1976 as Callan Contractors, we have an extensive portfolio encompassing the full spectrum of construction activities. More recently, the successful completion of many education developments has led us to attain a specialised knowledge of the relevant specifications and unique challenges of construction within the sector in Ireland.
We have earned a reputation for delivering cost effective solutions that often exceed our customers expectations. We pride ourselves on our impeccable track record of completing every project on time and within budget.
Making Your
Project a Reality
Why choose us
Our team has years of combined experience in all aspects of construction and engineering.
Commercial New
Builds
Residential
Developments
Social & Health Care Works in Live Environments
Public procurement contracts
Asbestos removal
works
Varied civil
works
Maintenance Contracts both Planned & Reactive
Extensive Works on Education Campus’
Detailed Restoration Works on Protected Buildings











Our Capabilities
Awards - ICE Winner 2023
CJ Callan Construction Limited are proud winners of the Irish Construction Excellence Awards in 2023
Project Details
Category: Fit Out or Refurbishment Up to €5m
Project: Advanced Manufacturing Training Centre of Excellence (AMTCE), Dundalk, Phase I
Contractor C.J. Callan Construction Ltd
Client: LMETB
Engineer: Patrick McCaul Environmental Consulting Engineers Ltd, Hanley Pepper Consulting Engineers – Civil & Structural
Architect: Oppermann Associates
The project consisted of the first phase of a two-phase internal remodelling, refurbishment and high spec fit out to a 55,000 sq. ft. two-storey building in the Zerox Technology Park to deliver critical industry focused specialist training facilities in the Advanced Manufacturing and Technology space.
CJ Callan Construction Ltd was contracted to repurpose an existing Pharmaceutical Research & Development Building and deliver an Advanced Manufacturing Training Centre of Excellence. The works entailed an assessment of the existing building fabric and the demolition and refurbishment of Phase I works identified by the client and Design Team. The centre remained live during the programme and facilitated industry/learner’s continuing training throughout the build.
Fit out works had a particular emphasis on the compartmentation of the building, the provision of dedicated escape routes, and passive fire protection in addition to associated mechanical, electrical and life safety systems. The project required the re-configuration of the selected Phase I internal space including the forming of new spaces and escape routes to serve as an Advanced Manufacturing Training Centre of Excellence for various new technological advanced manufacturing training courses.
Various MMC techniques were employed to bring this project to a successful close including, BIM, 3D Modelling, Circular Economy principles, and most crucially majorly cross stakeholder collaboration with our client, design team, subcontracting and supply chain partners.
CJ Callan Construction Ltd are extremely proud to be part of such a prestigious project in the North-East of the country. The benefits from this project to this part of the country will be seen for generations.
CJ Callan Construction Ltd are a family run company with it’s roots firmly embedded in the North-East of the country. It is a testament to the area that this project was successfully completed with dedicated staff, sub-contractor and supplier base sourced from the local to area.
The standard of finish and attention to detail demanded by the Client and Design Team pushed our employees and sub-contractors to raise the already high bar we strive to achieve on all construction projects.




